a pre-inspection rush
Our next (and hopefully final) try at passing rough inspection is tomorrow, and today was a mad rush to get ready. The electrician was in all day, moving some things around and making last minute fixes (we changed our kitchen plan since he did the original wiring). The contractor's crew was hard at work loading the pile of rubble from the slab into the dumpster. It's getting smaller (both the slab and the pile). I went to Ikea to look some more at cabinets and to try to get ready to place my order.
0 Comments:
Post a Comment
<< Home