Friday, September 18, 2009

Week ending 9/18/09

C is on vacation for two weeks, and we spent 2.5 hours on Monday, his first day, replacing the internet cable in the attic. It goes from the box on the outside of the house, through the attic and to our hub. We've had unreliable internet forever and it's hugely frustrating. We've tried all sorts of fixes, and this is about the last thing we can try until we have to, {shudder of terror}, call in Verizon. We also spent 2 hours planning how we are going to finish the wiring and some other house jobs.

Here is the box on the outside of the house where the wire from the street meets the wire that goes through the attic into our wiring hub. The box was here when we bought the house, so no telling how long it's been here.



We are planning on doing some fun stuff and more mundane chores while C is on vacation.

On Friday, I unpacked yet another box from the garage (still there from our May 2006 move) and spent 15 minute sanding the back door.

Hours on windows and doors to date: 310.25

0 Comments:

Post a Comment

<< Home